You are here:  Home  >  Products  >  EGT
 
Name EGT
Size 42*15*3600*0.4mm
Lead Time 15 days/20'FCL
MinOrder 1*20'FCL
Package pieces in cartons and cartons in 20'FCL
          
LOADING QUANTITY
Type: EGT 42 A1
Main Tee: 25PCS/CTN, total 4050PCS / 162CTNS / 1*20’FCL
Long Cross Tee: 50PCS/CTN, total 24800PCS / 496CTNS / 1*20’FCL
Short Cross Tee: 50PCS/CTN, total 24800PCS / 496CTNS / 1*20’FCL
Wall Angle: 50PCS/CTN, total 3600PCS / 72CTNS / 1*20’FCL
Total: 57250PCS / 18000M2

Product Standard:CE; SONCAP
Please click the attachment.
Attachments:More
Installation Instructions
1.According to the design drawing, determine the ceiling height. Mark the desired height at each room corner then make a perimeter chalk line, which should be 20mm above your desired ceiling height.
2.Install hangers and fasteners--snap a chalk line for the main tees, attach hangers and wires.
3.Install main tees—pull each hanger wire through the hanger hole in the tee, bend the wire up and wrap it around itself three times. Then continue to insert all other hanger wires. The intervals of two main tees should be 1220 MM./1200MM.
4.Install cross tees—push cross tee end through the main tee slot until the sound “click”. Fasten the cross tees. The intervals of two cross tees should be 610 MM./600MM.
5.Lay in the ceiling panels—slightly tilt each panel up through the opening and lower it to rest squarely on all four tees..
6.Important notice: lighting and other fixtures must be supported by the grid, not by the ceiling panels

Copyright © CNBM International Corporation.All rights reserved
京ICP备09074187号